UPDATE 2nd March 2018
The two hydro schemes have been working at maximum capacity throughout the winter and we are awaiting the first payment from the feed in tariff.
Ross has his first payment and Hydrover say we should be paid in March as they will be paid from SSE in March (one year since the scheme was formed)
Ardentinny Renewables Trust
NOTES OF MEETING HELD 24th MAY 2017 IN ARDENTINNY BOWLING CLUB.
Douglas Menzies Bill Tierney Neil Robinson Janette Reilly Ross McCarther
Kenneth Evans
Apologies
Rob Bray
Not in attendance
David Mackenzie Thomas Marshall
Item |
Notes |
Action |
1 |
DM introduced everyone including Kenneth and a vote was conducted to co-opt Kenneth onto the ART.
Kenneth would become a direct replacement for Thomas Marshall who was stepping down from the group
|
Vote was proposed by Douglas Menzies
Seconded by Bill Teirney
Everyone present was in favour and Kenneth is now a co-opted member of the ART |
2. |
DM gave an overview of the current standing of the ART which is now fully set up as a charity which does have rules , a fully accepted constitution and responsibility’s such as attendance of meetings as and when required by the group
|
|
3. |
DM asked the secretary NR to remove Thomas Marshal from the headed paper and replace him with KE
|
Completed letter head has been revised. |
4 |
DM gave a full overview of the state of play for the current Hydrover system This system is now fully in place and although there are some minor teething issues with reception for the communications the system is complete and the ART may receive the first funds sometime in November 2017.
|
|
5 |
RM gave an overview of his current system. The system still has outstanding work to be completed such as electrical work and some turbine work but he expects the system to be up and running by the end of July. He has had to downgrade the system from 200kw to 100Kw due to decreases in the current FIT rates and increases in other costs, clearly this will have an impact on the amount of money coming into the group but until the system is up and running it is unknown how much the impact will actually be. He will inform the group once all the work has been completed and give us a full tour of the site
RM also stated that he is considering putting in another smaller 50Kw system in the area sometime in the future, he will notify the group if this goes ahead. |
|